In Visualcron 8.5.1 - pro I can make a report on alle jobs or choose jobs. And under the Server [localost] there are an option to get all fails jobs in the last 1-7 days.
Is it possible to get af report in pdf or text with only the failed jobs, I cant see that option anywhere?