Having a lot of scheduled tasks, it would be very convenient to be able to print out a trigger report. Having such a report makes it easy to see when (or why) the defined jobs are running.
The way things are right now, one needs to open every single job and every single trigger to see when the job is run.
Thanks in advance
Ernst Mikkelsen
Trifork A/S