Hi.
the Progress bar (status) showing % of Job done is a great feature.
would be even better if calculation could not only consider the very last run, but instead the average of all Job runs and even better : only those successful runs.
why: to avoid that the process bar is showing 99% only because the last time it run it took that fast (exceptionally) or it failed (also fast) .
thank you.