As I was debugging an infinite loop in my job by using the Flow Chart feature, I noticed that any error flow that I specified as a Notification is displayed as an Ends Job followed by a Notification. In the GUI, they appear to be mutually exclusive options (radio buttons) - if you want both, you have to add two Flows. Is this a bug in the Flow Chart display (e.g., a holdover form the old Notifications implementation), or am I missing something?
(Oh, and I resolved my infinite loop. It had to do with my updating of a Job variable).
Thanks,
Rebeccah