VisualCron,
Great product, thanks. One thing that would be much appreciated would be the ability to expand the calendar view to see details for a given block of time: e.g. suppose I have many jobs scheduled to run between 8 and 9 am. The current calendar view shows many overlapping windows and is not useful for providing an overview of the processes. If I could drag the start line for 8AM upwards or the 9AM line downwards or otherwise specify a smaller time window than an entire day, the calendar view would be much more useful.
I hope this feature can be implemented soon.
Thank you.