Hi Support,
1) Yes,
- any system generated errors which would be missed by normal job/task level processing.
- Low diskspace on install drive. (as per previous email on creating task).
- Low diskspace on target drive of task, don't know if this would currently cause an issue.
- VC Service status change.
- Trigger non-existent, deactivated etc.
- Unable to connect to a "connection", i.e. SMTP server.
The big issue for me is disabled triggers, this is not the first time this has caused us problems.
Not if some of the above are already picked up at job/task level, but I would consider them to be high-level alerts which should go back to admin/Helpdesk etc.
Graham