Hi,
I found a bug in the variable window.
In the main window, open a task from job A.
From this task, press the Variable button in the bottom left.
Open job B and open the Tasks.
You see alle the tasks from job B ánd the selected task from job A (with a green arrow).
The tasks should only show the tasks from job B.
Regards,
Erik
Uses Visualcron since 2006.