Can you add tasks under "Internal" to allow me to import from a backups onto a second server with VisualCron running.
I would like to have a Disaster recover server setup but with "Server=OFF" ready to run using settings/jobs loaded from the night before. Currently we export using the backup task to a shared folder on network, but I would like to have this loaded and ready in a DR server.
A task to Import that I can run on server A (Production) that controls server B (Disaster) and forcese it to load the last backup, but not enable the server.
Also "File Watchers" need to be disabled while Server=OFF setting. Currently they continue to work when I import backup with Server=OFF. To get around this I manually disable ALL jobs on DR server after a an import.
Thanks,
Richard Forss