I have a job that is set to execute every 15 minutes. I'm not sure how long the job will take and need to ensure that I do not get two instances of that job. How can I do one of the following:
1) Specify that the job runs 15 minutes after the previous job ended
2) If the job did not complete in its 15 minute time slot, the job will not begin until the the first one finishes.
Thanks.
Edited by moderator
2014-02-20T08:08:46Z
|
Reason: Not specified