I look on ResultImage whether a job ended successful or not. If not I sometimes doesn't start the VC job again but correct some variables in job and start the batchjob manually without VC.
Therefore I would like the possibility to change the result image/result manually from red circle to green circle so another user can see the job is o.k. For him it doesn't matter whether the job finised correct in VC or per manual batch .