Get a customized tour of VisualCron’s automation, integration, and task scheduling capabilities.
Explore VisualCron’s full power at your own pace with a free, all-access trial for 30 days.
Henrik,Can I achieve a similar functionality by kicking off a job/task from another job using the Job/Task Control task type?Then can I set different values for the variables at the job control task level and another set of values for the same variables at the job level?E.g.Job A (set values for a set of variables) Job/Task Control Task (pointing to Job B and Task B1) (set different values for the same set of variables)Can I do this?Thanks.
© SMA Technologies. All Rights Reserved, 2024 Version: 11.1.26.176dac7